Post-Construction Cleaning Prices: How to Quote the Job
Your first builder or homeowner just asked for a quote on a post-construction clean, and you have no idea whether to say $300 or $1,000. Here’s a starting point: post construction cleaning prices for homes average about $0.24 to $0.38 per square foot in the six Angi 2026 city pages below, and HomeAdvisor puts a typical residential job at $274 to $708. Don’t guess your price. Estimate your hours at 100 to 200 square feet per hour, multiply by your hourly rate, add supplies, then check the total against those local ranges. If you’re still setting up the business itself, start with the Day One Business Kits™ Cleaning Business guide.
- 12 min read
- For brand-new cleaners
Free printable PDF · 6 pages
Get the free Price Your First 10 Jobs worksheet
A price built from your own numbers, plus a 10-job tracker so you can see whether your prices hold up.
Your PDF link comes by email, followed by a short series of tips and offers for new cleaning business owners. Unsubscribe anytime. Privacy Policy
How much should you charge for post-construction cleaning?
For a typical home, as of 2026, a final post-construction clean usually costs a few hundred dollars up to about $1,400, depending on size and city. According to HomeAdvisor’s cost guide, the normal range is $274 to $708, the average is $477, and jobs can run as low as $144 or as high as $1,300.
Local numbers matter more than national ones. Angi publishes city pages, and the gap between cities is wide. Here’s what a 2,000 sq ft cleanup averages in six of them:
| City (Angi, 2026 data) | Avg. per sq ft | 2,000 sq ft average (range) | Hourly, per worker |
|---|---|---|---|
| Minneapolis, MN | $0.24 | $475 ($200–$950) | $20–$35 |
| Dallas, TX | $0.25 | $500 ($200–$1,000) | $20–$50 |
| Houston, TX | $0.30 | $600 ($250–$1,200) | $25–$70 |
| New York City, NY | $0.32 | $640 ($250–$1,270) | $25–$65 |
| Los Angeles, CA | $0.35 | $700 ($300–$1,400) | $25–$100 |
| San Francisco, CA | $0.38 | $760 | $40–$80 |
Look at how wide those ranges are. A 2,000 sq ft Houston job can be $250 or $1,200. What decides it is how dirty the place is, how much detail the client wants, and which phase of cleaning you’re doing. Treat these figures as a sanity check. They aren’t your price.
What are the three phases of post-construction cleaning?

Post-construction cleaning is usually split into a rough clean, a final clean and a touch-up clean, and each one is priced separately. CleanerHQ’s 2026 pricing guide gives these typical rates:
| Phase | When it happens | What you do | Typical 2026 rate |
|---|---|---|---|
| Rough clean | After the heavy work, before finishes go in | Haul out debris, remove heavy dust and residue, clear the space so the finish trades can work | $0.10–$0.30 per sq ft |
| Final clean | After the trades finish | Detail-clean every surface, floor, fixture and window before the walkthrough | $0.30–$0.75 per sq ft |
| Touch-up clean | Just before inspection or move-in | Fix spots that got dirty after the final, often after punch-list repairs | $150–$500 flat per visit |
A solo house cleaner can reasonably start with the final clean. It pays best per square foot, and it’s the closest to what you already do. Rough cleans are more about hauling debris, which means a truck, a dumpster or a dump run. If you don’t have those, don’t take the job.
Put each phase on its own line in your quote. If a contractor asks for “the clean” and you quote only a final, write “touch-up visit not included, $___ if needed.” Construction schedules slip, and dust settles again after the last trade leaves.
Should you charge per square foot or by the hour?
Quote a flat price that you worked out from hours, and show it per square foot if the client wants that. Contractors budget by the square foot, and homeowners want one number. Your hours tell you whether that number covers your time.
| Method | Best for | Risk to you | Risk to the client |
|---|---|---|---|
| Per square foot | Contractors, new builds, repeat builder work | Underpricing a small, filthy remodel where a low rate covers too few hours | Paying full rate for rooms that barely need work |
| Hourly | Small remodels, punch-list re-cleans, jobs you can’t fully see | Clients pushing you to hurry, and no reward for working fast | No firm budget |
| Flat price (built from hours) | Most solo jobs | Low if you walked through first | Low, because they know the total upfront |
How do you quote a post-construction cleaning job, step by step?
Walk through the space, estimate your hours from the square footage, multiply by your hourly rate, add supplies and extras, then check the total against local per-square-foot data. HomeAdvisor’s guidance for homeowners says to plan on one hour of cleaning for every 100 to 200 square feet, and that a two-to-four-person crew needs 8 to 12 hours for a full-size home.
- Walk the job before you quote. Note the square footage, the number of bathrooms, the window count, and any paint on the glass or adhesive on the floors.
- Pick your production rate. Use 200 sq ft per hour for light dust and a small remodel, 150 for a normal new build, and 100 for heavy drywall dust everywhere.
- Divide the square footage by that rate and round up to the next whole hour.
- Multiply by your hourly rate. Use your own target rate, set with your pricing guide numbers, not a competitor’s.
- Add supplies, travel and any add-ons, such as windows, debris haul-off or a touch-up visit.
- Divide the total by the square footage and compare it with your city’s range in the table above. If you’re far above or below, check your production rate again.
Example: a 2,000 sq ft new build, final clean, one cleaner.
Production rate: 150 sq ft per hour (normal new-build dust).
Hours: 2,000 ÷ 150 = 13.3, rounded up to 14 hours.
Labor: 14 hours × $45 per hour (example rate) = $630.
Supplies (extra bags, razor blades, pads, HEPA filter wear), example: $40.
Quote: $630 + $40 = $670.
Per square foot: $670 ÷ 2,000 = $0.335.
Same house, different conditions:
Light dust at 200 sq ft/hr: 10 hours × $45 + $40 = $490 ($0.245 per sq ft).
Heavy dust at 100 sq ft/hr: 20 hours × $45 + $40 = $940 ($0.47 per sq ft).
Prices vary by area. Use your own rate and your own walk-through.
Now the cross-check. In Houston, Angi’s 2,000 sq ft average is $600, with a range of $250 to $1,200. All three versions of this quote fall inside that range, so the method holds up. Look at the hours, though. HomeAdvisor’s 8 to 12 hours is for a crew of two to four. On your own, 14 hours is two long days. Ask for the move-in or inspection date before you say yes.
Skip the math
House Cleaning Pricing Calculator
The same formula as this guide, in a spreadsheet: enter your rate, supplies and mileage once and get prices for 8 home sizes across standard, biweekly, deep clean and move-out jobs. It also shows what you earn per hour on each quote. Works in free Google Sheets and Excel. If you undercharge one every-2-weeks client by $10 a visit, that's $260 a year from one client. The calculator is $12 and shows what you earn per hour before you send a quote.
Or get all 4 tools in the Launch Kit: $44 instead of $64 separately. See the Launch Kit or browse all the templates in the shop.
What extras should you price separately?
Price windows, carpet, floor waxing, duct work and debris haul-off as separate line items, because each one changes the time a lot. Angi’s 2026 national figures show what clients typically pay for each:
| Add-on | National average (Angi, 2026) | Solo cleaner note |
|---|---|---|
| Window cleaning | $150–$300 | Paint overspray and stickers take far longer than everyday glass. Count the panes during the walk-through. |
| Touch-up visit | $75–$200 | Quote it upfront as an option. |
| Carpet cleaning | $120–$240 | Needs an extractor. Refer it out if you don’t own one. |
| Floor waxing | $1–$1.50 per sq ft | Specialist work. Refer it out unless you’re trained. |
| HVAC duct cleaning | $180–$400 | Leave this to duct specialists. |
Debris haul-off is the add-on that surprises new cleaners most. In Dallas, Angi puts construction debris removal at $100 to $300, and up to $800 for a large load. If your quote says “debris removal by others,” write that in plain words.
What equipment and safety gear do you need for post-construction cleaning?
You need a HEPA-filtered vacuum, a way to clean wet, scrapers for glass, and a mask rated for fine dust. A regular household vacuum without a HEPA filter can blow fine drywall and concrete dust back into the room, so use a HEPA-filtered vacuum.
- HEPA-filtered vacuum with brush and crevice tools
- Microfiber cloths in bulk (they clog fast), plus buckets and a wet mop
- Glass scrapers with fresh razor blades for paint and stickers
- Step ladder and extension pole for vents, fans and top trim
- Heavy contractor bags
- Respirator or dust masks, safety glasses and work gloves
Some construction dust contains crystalline silica, which comes from concrete, tile and stone. OSHA’s construction silica standard says employers must not allow dry sweeping or dry brushing where it could expose workers to silica, unless wet sweeping or HEPA vacuuming isn’t feasible. It also limits cleaning with compressed air. Even if you work alone and the rule doesn’t apply to you, follow the same practice: vacuum with a HEPA filter, wipe damp, and never use a leaf blower or air hose indoors. If you hire helpers, OSHA rules may apply to you as an employer, so confirm your obligations with OSHA or a qualified safety or legal professional.
Homes built before 1978: the EPA’s lead Renovation, Repair and Painting program requires certified lead-safe contractors on renovation projects that disturb lead paint in pre-1978 homes. If the remodel involved old paint, ask the contractor whether they followed lead-safe practices and cleanup before you agree to clean. If they can’t answer, pass on the job, and check with the EPA or your state agency. This is general information. Confirm your own obligations, and your license and insurance coverage for this work, with a licensed professional.
Who hires post-construction cleaners, and what do they expect?
Your two main buyers are general contractors and builders getting a property ready for handover, and homeowners after a remodel. HomeAdvisor describes the work as a deep clean that comes after the contractor’s basic cleanup, catching the dust and debris they missed.
Contractors care about the deadline, a fixed price and not getting called back. If you hit the walkthrough date, they may hire you again for their next job. Homeowners care about whether the place looks and feels clean enough to live in, so the inside of cabinets and every vent cover will get checked.
Ask these questions at the walk-through, and put the answers on the quote:
- What date must it be done by, and will trades still be working while I clean?
- Is debris haul-off mine or yours?
- Do you need inside cabinets, inside appliances and window tracks?
- Are water and power on, and where do I dump dirty water?
- When was the house built?
How is post-construction cleaning different from a deep clean?
A deep clean removes everyday buildup from a lived-in home. A post-construction clean removes construction dust, paint, adhesive and stickers from surfaces nobody has lived with yet. The dust is finer and gets everywhere: inside drawers, on top of door frames, in window tracks and on every light fixture.
That’s why you shouldn’t quote a post-construction job at your deep-clean rate. Use the production-rate method above, and use a separate task list. A phase-by-phase list, adapted from your house cleaning checklist, also shows the client exactly what was included.
Frequently asked questions
How much should I charge for cleaning after builders?
For a typical home, HomeAdvisor puts post-construction cleaning at $274 to $708, with an average of $477. City averages on Angi run from about $0.24 to $0.38 per square foot as of 2026. Build your own price from your estimated hours, then compare it with those ranges. Source.
How do I charge for construction cleaning?
Estimate your hours at 100 to 200 square feet per hour, multiply by your hourly rate, and add supplies and extras. A common approach is to give the client a flat price and show it per square foot for contractors. Source.
What does a post-construction final clean include?
It’s a detail clean of every surface, floor, fixture and window before the walkthrough. Debris haul-off, carpet extraction, floor waxing and duct cleaning are usually priced separately. Source.
Can I dry sweep construction dust?
OSHA’s silica standard says employers must not allow dry sweeping where it could expose workers to silica, unless wet methods or HEPA vacuuming aren’t feasible. Use a HEPA vacuum and damp wiping instead. Source.
How long does a post-construction clean take?
HomeAdvisor says to plan on one hour for every 100 to 200 square feet, and 8 to 12 hours for a two-to-four-person crew on a full-size home. Working alone, a 2,000 sq ft house can take one to two long days, depending on how dusty it is. Source.
Measure the next job you’re asked to quote, then run it through the free Price Your First 10 Jobs worksheet using the hours method above. If you haven’t set your base hourly rate yet, do that first with the pricing guide.
Sources
- HomeAdvisor: How Much Does Post-Construction Cleaning Cost?: National range of $274–$708, average of $477, low of $144 and high of $1,300; the clean follows the contractor’s basic cleanup
- HomeAdvisor: Local Post Construction Cleanings: One hour per 100–200 sq ft; 2–4 person crew needs 8–12 hours for a full-size home
- Angi: Post-Construction Clean Up Cost in Houston, TX: $0.30 per sq ft, 2,000 sq ft average and range, $25–$70 per hour, add-on costs
- Angi: Post-Construction Clean Up Cost in Dallas, TX: $0.25 per sq ft, 2,000 sq ft figures, $20–$50 per hour, debris removal $100–$300 (up to $800), contractor bags price
- Angi: Post-Construction Clean Up Cost in Los Angeles, CA: $0.35 per sq ft and 2,000 sq ft figures
- Angi: Post-Construction Clean Up Cost in New York, NY: $0.32 per sq ft, 2,000 sq ft figures, $25–$65 per hour
- Angi: Post-Construction Clean Up Cost in Minneapolis, MN: $0.24 per sq ft, 2,000 sq ft figures, $20–$35 per hour
- Angi: Post-Construction Clean Up Cost in San Francisco, CA: $0.38 per sq ft, 2,000 sq ft average, $40–$80 per hour
- CleanerHQ: Post-Construction Cleaning: Pricing the 3-Phase Clean (2026): Phase rates: rough $0.10–$0.30/sq ft, final $0.30–$0.75/sq ft, touch-up $150–$500 flat
- OSHA: Respirable Crystalline Silica in Construction FAQs: Housekeeping rules on dry sweeping, dry brushing and compressed air
- EPA: Lead Renovation, Repair and Painting Program: Lead-safe certified contractors required on renovation projects that disturb lead paint in pre-1978 homes
This guide is general information about pricing and safely performing post-construction cleaning, not legal, tax or financial advice. Rules and prices vary by area. See our Disclaimer.